Site Hut Price List 06/07 Ex. VAT

  SIZE
Actual
Metric
L x W
Approx.
Imperial
L x W
Building
Floor Erection
3.6 x 3.14
5.4 x 3.14
7.2 x 3.14
12 x 10
18 x 10
24 x 10

£1254
£1584
£1914

£165
£248
£330
£151
£190
£230
3.6 x 3.74
5.4 x 3.74
7.2 x 3.74
12 x 12
18 x 12
24 x 12
£1364
£1727
£2090
£198
£297
£396
£164
£207
£249
5.4 x 4.34
7.2 x 4.34
9.0 x 4.34
18 x 14
24 x 14
30 x 14
£1914
£2310
£2706
£346
£462
£578

£230
£276
£322

5.4 x 4.94
7.2 x 4.94
9.0 x 4.94
18 x 16
24 x 16
30 x 16
£2134
£2563
£2992
£396
£528
£660
£256
£309
£362
5.4 x 5.54
7.2 x 5.54
9.0 x 5.54
18 x 18
24 x 18
30 x 18

£2354
£2816
£3278

£446
£594
£743
£282
£339
£395

Price includes: single door, felt, fixings, and delivery within zone 1

Options

Window 1.05m high x 0.915m wide pattern 2N10C £150
Single t&g door with rimlock (1.98 x 0.76) £140
Double t&g doors with rimlock (1.98 x 1.52) £260
Partition clad 1 side to eaves in 9mm osb £46/m run
112mm Gutter (black plastic) £9/m run
Downpipe assembly £18 each
Immersion in golden brown wood preservative +10%

Notes

Planning Approval

The customer is responsible for Local Authority approvals when applicable. Passmores supply drawings upon request.
Site Preparation The customer is responsible for foundations. Please ask us for a baseworks drawing before starting work.
Delivery Costs
Click for map
Delivery Access Most buildings are delivered on 7.5 tonne, 2 axle, rigid vehicles, size 9.0 x 2.4 x 3.0 high. Unloading will be to nearest point to metalled road. If Passmores is erecting we will carry components up to 20m from delivery point. We will drive off road only at customer's risk and providing tractor or 4x4 is available for towing. If carry is further or obstructed we will ask you to provide labour to assist.
Erection Service Prices apply to delivery zones 1 and 2 . Click for map. Price assumes delivery vehicle access within 20m, correct foundations and availability of 240v, 13 amp, power.
Customer Assembly Our products enjoy a high degree of prefabrication in our factory. The assembly process is relatively straightforward, requiring basic carpentry skills and hand tools. Buildings are supplied with detailed assembly instructions, packing lists and spare materials. Some components are heavy.
VAT AIl prices exclude VAT: Buildings supplied for certain non-business charitable uses may be zero rated. AIl other transactions attract VAT at 17½.% extra.